Catchment of Dam site | 25,250 sq.km |
Free catchment at barrage site | 4,780 Sq.Km |
Observed Max. Flood at Barrage Site | 30.00cum. |
Designed supper Flood at Barrage site | 49.000cum. |
Mean Annual Rainfall | 157 Cm |
Mean Annual Run off | 1.49 Million Ha.m |
Design Flood ast Dam Site | |
1000 year return period | 27.800 Cumec |
Maximum probable Flood | 55.540 Cumec. |