logo

Odisha Hydro Power Corporation Ltd.

A Gold rated State PSU( A Govt. of Odisha Undertaking )

Powering Green Energy

Projects Overview

Projects Under Operation

Power Stations Installed Capacity (MW)
Total generation (MW)
Burla
2 x 49.5 MW + 2 x 32 MW +2 X 43.65 MW + 1 X 37.5 MW
287.8 MW
Chipilma
3 x 24 MW
72 MW
Balimela
6 x 60 MW + 2 x 75 MW
510 MW
Rengali
5 x 50 MW
250 MW
Upper Kolab
4 x 80 MW
320 MW
Upper Indravati
4 x 150 MW
600 MW
Machkund
50% Odisha share of 120 MW (3 x 23 MW + 3 x 17)
60 MW
Total
2099.8 MW

Projects in Closed State

Power Stations Installed Capacity (MW)
Total generation (MW)
Potteru Small Hydro Electric Project
2 X 3MW
6 MW

Projects Identified For Future Implementation

Power Stations
Total generation (MW)
Middle Kolab Hydro Electric Project Installed capacity as per PFR by DOWR 200 MW
Tel Integrated Project Installed capacity as per PFR by DOWR 50 MW
Lower Vansadhara Project Installed capacity as per PFR by DOWR  18 MW
Balijori Hydro Electric Project or Bhimkund Installed capacity as per PFR by DOWR 160 MW
Salki Hydro electric Project Installed capacity as per PFR by DOWR 165 MW
Khadago Project Installed capacity as per PFR by DOWR 100 MW
Uttel & Roul Integrated Project Under Survey and integration by DOWR  
Pumped Storage Power Station (PSPS) OHPC has planned for development of Pumped Storage Power Station (PSPS) at Balimela Hydro Electric Project, Upper Kolab Hydro Electric Project & Upper Indravati Hydro Electric Project. Preparation of the pre-feasibility report of the above projects has been completed. In the first phase, DPR of PSPS at UIHEP, Mukhiguda is under preparation by M/S WAPCOS Ltd.. Conceptual layout plan of the above project has been approved by DOWR, Govt. of Odisha. Topological survey has been completed and Geo-Technical investigation is under progress. Further tender document has been prepared for floating tender merely for preparation of DPR of PSPS at Upper Kolab.

RM & U

R.M.&U of Unit-5 & 6 of HHEP, Burla 2 x 37.5 MW to be updated to 2 x 43.6 MW
R & M of Unit-3 of CHEP, Chipilma 1 x 24 MW=24 MW
R & M of Units 1 to 6 of BHEP, Balimela 6 x 60 MW=360 MW

Varun