Reservoir/Generation Data

Select Date

Nov 20, 2024 RESERVOIR LEVEL Previous Day's Nov 20, 2024
NAME OF P.H FRL MDDL Previous day Today This day  of Previous year AVG.GEN.
(MW)
Equivalent
Energy (MU)
PEAK.(MW) Water Utilized for Gen Units available (Today) Remarks
BHEP,BALIMELA 1516 Ft 1440 Ft 1505.40 1505.30 1487.40 209.0833 5.0180 402 (24 Hr.) 273.4854 Mcft. / 3165.3401 Cusecs 2,3,4,5,6,7,8 #1:F.O. (Heavy water leakage from discharge ring).
HHEP,BURLA 630 Ft 590 Ft 626.23 626.29 628.15 0.0000 0.0000 0 (Hr.) 0.0000 MCft. / 0.0000 Cusecs All No generation due to drying of the Power Channel for repairing & rehabilitation work.
CHEP,CHIPILMA ********* ********* ********* ********* ********* 0.0000 0.0000 0 (Hr.) 0.0000 MCft. / 0.0000 Cusecs 2,3 No generation due to drying of the Power Channel for repairing & rehabilitation work. #1:P.O. (Capital Maintenance).
RHEP,RENGALI 123.5 M 109.72 M 120.63 120.59 122.64 75.3583 1.8086 251.6 (09 Hr.) 18.1448 MCM / 210.0079 Cumecs All *********************
UIHEP,MUKHIGUDA 642 M 625 M 634.41 634.43 636.06 12.5208 0.3005 158.5 (18 Hr.) 0.3606 MCM / 4.1736 Cumecs All *********************
UKHEP,BARINIPUT 858 M 844 M 855.27 855.25 855.72 101.6667 2.4400 237 (24 Hr.) 4.4503 MCM / 51.5085 Cumecs All *********************
MHEP,MACHKUND 2750 Ft 2685 Ft 2747.80 2747.70 2727.40 14.9167 0.3580 48 (05 Hr.) ***************** 1,3,4,6 Under APGENCO Control.
  TOTAL 413.5458 9.9251