logo

Odisha Hydro Power Corporation Ltd.

A Gold rated State PSU( A Govt. of Odisha Undertaking )

Powering Green Energy

Notice

Cancellation of OHPC-02/2022-23

Cancellation of OHPC-02/2022-23 for Supply of Uniform for the Lady employees of OHPC.

Download

1st Corrigendum to CHEP-10/2022-23

1st Corrigendum to CHEP-10/2022-23 Providing Under water diving & salvage works at Chiplima Power House

Download

1st Corrigendum to BHEP-06/2022-23

1st Corrigendum to BHEP-06/2022-23 for Supply of earthing materials and Construction of Separate earthing for all LAs at Switchyard and DG Set at Power House of BHEP, Balimela.

Download

Cancellation of CHEP-38/2021-22

Cancellation of CHEP-38/2021-22 for Improvement of Badminton Court including earth filling and concreting for Cricket practice pitch at Officer’s Club, CHEP, Chiplima Rs.2,360/- (Rs.2,000/- + GST @18%)Rs.2,47,202/-

Download

Cancellation of BHEP-05/2022-23

Cancellation of BHEP-05/2022-23 for Procurement of One Set of Insulating oil PPM Kit with its accessories for BHEP, Balimela

Download

Cancellation of BHEP-04/2022-23

Cancellation of BHEP-04/2022-23 for Procurement of Contact Resistance Measurement (CRM) Kit with its Accessories, BHEP, Balimela.

Download

Cancellation of CHEP-03/2022-23

Cancellation of CHEP-03/2022-23 for Photocopying of official documents of various sizes of CHEP, Chiplima

Download

2nd Corrigendum to BHEP-03/2022-23

2nd Corrigendum to BHEP-03/2022-23 for Industrial Safety Shoes

Download

1st Corrigendum to UKHEP-01/22-23

1st Corrigendum to UKHEP-01/22-23 for Supply, Retrofitting and Commissioning of 2000 Amps, 0.4KV, 3P EDO ACB with microprocessor release to be installed at unit-4 ,U.K.H.E.P

Download

1st corrigendum to UKHEP-05/2022-23

1st corrigendum to UKHEP-05/2022-23 for Procurement of Panel for 20HP induction motor commissioned at tail race channel right side bank, UKHEP,Bariniput

Download

Cancellation of CHEP-29/2021-22

Cancellation of CHEP-29/2021-22 for Providing Under water diving and salvage works at Chiplima Power House

Download

1st Corrigendum to BHEP-03/2022-23

1st Corrigendum to BHEP-03/2022-23 for Industrial Safety Shoes

Download

1st Corrigendum to RHEP-03/2022-23

1st Corrigendum to RHEP-03/2022-23 for Re-tubing of UGB Oil Coolers (9 Nos.), LGB Oil Coolers (9 Nos.) and Thrust Bearing Oil Coolers (3 Nos.)

Download

1st CORRIGENDUM TO RHEP-02/2022-23

1st CORRIGENDUM TO RHEP-02/2022-23 FOR ROOF TREATMENT WITH PLASTIC FELT OVER THE ROOF OF RESIDENTIAL AND NON-RESIDENTIAL BUILDINGS OF RHEP,RENGALI.

Download

1st Corrigendum to RHEP-53/2021-22

1st Corrigendum to RHEP-53/2021-22 for Supply, Installation and Commissioning of 220volt ,425AH Exide Plante Lead Acid battery Banks (2 Sets)Containing 110 cells of 2Volt ,425AH Plante Cells per set in san container (model –ykp35) of Rengali Power House, Rengali on buy back basis

Download

Cancellation of CHEP-39/2021-22

Cancellation of CHEP-39/2021-22 for Photocopying of official documents of various sizes of CHEP, Chiplima

Download

1st Corrigendum to BHEP-01

1st Corrigendum to BHEP-01 for Hiring of 01 (One) Number of (TUV300/Bolero/Sumo Gold/ Ertiga) Vehicle with Single Driver for 4 (Four) years under BHEP, Balimela.

Download

1st Corrigendum to e - Procurement Notice of RHEP-01/2022-23

1st Corrigendum to e - Procurement Notice of RHEP-01/2022-23 for Roof Treatment of Switchyard Store, Cycle shed inside Power House premises with Tarfelt BH.

Download

Corrigendum to ARR and Generation Tariff application of OHPC for FY 2022-23

Corrigendum to ARR and Generation Tariff application of OHPC for FY 2022-23

Download

Cancellation of HHEP-08/21-22

Cancellation of HHEP-08/21-22 for Galvanic Reinforcement & Epoxy protection coating of spiral casing, Guide vanes, Stay vanes, Stay ring and Runner chamber against corrosion of Unit No. 2 with ITW Devcon range of product of Burla Power House

Download

1st Corrigendum to RHEP-59/2021-22

1st Corrigendum to RHEP-59/2021-22 Hiring of 58 Nos. of Air Coolers for three months for Offices and Power House under RHEP,Rengali

Download

1st corrigendum to HHEP-07/2022

1st corrigendum to HHEP-07/2022 for Supply, installation and commissioning of radar level sensor for tailrace water level measurement for HHEP, Burla

Download

Varun