Power Station |
|
---|---|
Burla | 58.5417 |
Chiplima | 39.5833 |
Balimela | 327.1250 |
Rengali | 148.2667 |
Kolab | 106.7083 |
Indravati | 351.1875 |
Machhkund (Odisha drawl) |
33.4583 |
Total | 1064.8708 |
Through the centre addresses the training needs of hydro-power industry in particular and occasional MDPs now, the infrastructures are geared to meet the training requirements of all concerned. Continuous review and strategic analysis prompts the center to training ventures with "concept-first-then-action" methodologies for the new millennium.
The essence of success lies in capitalizing the human strengths with cost-effective support of resource-allocations so as to overcome the weaknesses and march ahead into the future with confidence.