NAME OF P.H FRL MDDL Previous day Today This day  of Previous year AVG.GEN.
(MW)
Equivalent
Energy (MU)
PEAK.(MW) Water Utilized for Gen Units available (Today) Remarks
BHEP,BALIMELA 1516 Ft 1440 Ft 1500.90 1501.00 1513.00 239.4583 5.7470 296(14 Hr.) 315.5234 Mcft . / 3651.8907 Cusecs 3,5,6,7,8 #1,#2 P.O (R &M Works ), #4 F.O (Problem in PMG).
HHEP,BURLA 630 Ft 590 Ft 629.89 630.00 630.00 113.2917 2.7190 115 (18 Hr.) 1257.0180 Mcft / 14548.8200 Cusecs 2,3,4 #1: F.O.(Turbine top cover / shaft seal water leakage), #5, #6: P.O.(R,M&U works), #7: P.O. ( Annual Maintenance of the Unit.). Open-02 Nos
CHEP,CHIPILMA ********* ********* ********* ********* ********* 57.7917 1.3870 63 (20 Hr.) 968.3323 Mcft / 11207.5500 Cusecs All *****************
RHEP,RENGALI 123.5 M 109.72 M 122.50 122.59 123.98 234.5583 5.6294 239.6 (21 Hr.) 57.0868 MCM / 660.7226 Cumecs All *****************
UIHEP,MUKHIGUDA 642 M 625 M 638.12 638.11 641.02 217.4375 5.2185 493.5 (19 Hr.) 6.2622 MCM / 72.4790 Cumecs All *****************
UKHEP,BARINIPUT 858 M 844 M 851.36 851.37 856.34 77.0417 1.8490 192 (15 Hr.) 3.5726 MCM / 41.34991 Cumecs 1,2,4 #3 : P.O.(Turbine Guide Bearing Problem).
MHEP,MACHKUND 2750 Ft 2685 Ft 2743.45 2743.50 2748.25 33.7083 0.8090 43(20 Hr.) ******************* 1,2,3,4,5 Under APGENCO control Machines available.
  TOTAL 973.2875 23.3589