logo

Odisha Hydro Power Corporation Ltd.

( A Govt. of Odisha Undertaking ) Powering Green Energy

A Gold rated State PSU

Reservoir/Generation Data

Select Date

Aug 26, 2025 RESERVOIR LEVEL Previous Day's Aug 26, 2025
NAME OF P.H FRL MDDL Previous day Today This day  of Previous year AVG.GEN.
(MW)
Equivalent
Energy (MU)
PEAK.(MW) Water Utilized for Gen Units available (Today) Remarks
BHEP,BALIMELA 1516 Ft 1440 Ft 1472.50 1472.80 1490.60 193.2083 4.6370 315 (24 Hr.) 262.4733 MCft. / 3037.8857 Cusecs 2,3,4,7,8 #5 & #6 P.O. (R &M Works); #1:P.O. (Annual Maintenance).
HHEP,BURLA 630 Ft 590 Ft 621.69 621.52 621.77 224.3750 5.3850 232 (01 Hr.) 2673.1296 Mcft. / 30939.0000 Cusecs 1,2,3,4,5,6 #7: F.O. (Heavy spark and abnormal sound observed near slip ring); Sluice gate opening status;12 (Left-8 no., Right-4 no.)
CHEP,CHIPILMA ********* ********* ********* ********* ********* 39.7917 0.9550 42 (03 Hr.) 706.7416 MCft. / 8179.8800 Cusecs 2,3 #1:P.O.(Capital Maintenance).
RHEP,RENGALI 123.5 M 109.72 M 122.74 122.85 121.27 229.1667 5.5000 240.0 (14 Hr.) 61.8911 MCM / 716.3276 Cumecs All Spillway gate opening status:02 (8,9 & 10).
UIHEP,MUKHIGUDA 642 M 625 M 635.68 635.90 634.30 152.9583 3.6710 601.0 (21 Hr.) 4.4052 MCM / 50.9861 Cumecs All *********************
UKHEP,BARINIPUT 858 M 844 M 853.69 853.77 855.01 101.2083 2.4290 296 (24 Hr.) 4.4674 MCM / 51.7059 Cumecs All *********************
MHEP,MACHKUND 2750 Ft 2685 Ft 2747.60 2748.05 2743.60 40.6250 0.9750 54 (08 Hr.) ***************** 1,2,3,4,6 Under APGENCO control machines available.
  TOTAL 981.3333 23.5520