SIONDOL COMPLEX H.E. PROJECT

Sindol Power Complex comprises of three nos. of run off river schemes on the   downstream of


Future Implementation

Hirakud Dam, The scheme will utilise the drop in river bed above 14 Mt. 26 Mt. & 18 Mt. at Sindol I,II & III respectively, with in a span of 95 Km from Chipilima P.H. and regulate the water release and spill water from Hirakud Reservoir of Power Generation.

The total estimated cost of the complex is Rs.2431.70 Cr. ( as per 2006 PER). on implementation, the complex would yield 1084.28 GWH annually and add peaking capacity upto 300 MW to the Stat Grid.

The major features of these three schemes are furnished below:

Item

Deogaon Sibdol-1

Kapasira Sindol-2

Godhaneswar Singol-3.

Distance from Chiplima P.H. in KM

19

55

94

Installed Capacity

3 x 30

3 x 30

4 x 30

Normal Operating Head (Meter)

8.0

8.0

8.0

Annual Energy Generation (GWH)

323.89

357.29

403.10

Estimated  cost (Rs.in Cr.)

(As per 2006 PFR)

674.85

818.28

938.57

Land requirement

250 Ha

620 Ha

350 Ha

Cost of generation (i) av. Year.

Rs.2.86

Rs.2.96

Rs.3.06

As per PFR (ii) 1st Year

Rs.3.16

Rs.3.12

Rs.3.23

Rehabilitation Requirement will be assessed after preparation of DPR.

Deogaon Project (Sindol-1) :

§          A  Barrage of length 811.5 M with design discharge of 37600 Cumecs.

§          Intake cum Power House accommodating 3 x 30 MW Unit

§          220 KV Switchyard in left bank with three number of feeders.

Kapasira Project (Sindol-2) :

§          A barrage of length 919.5 M with design flood discharge 38600 Cumecs.

§          Right and left marginal embankment of length 7 Km and 4 Km respectively.

§          Intake cum Power House accommodating 3 x 30 MW Units.

§          220 KV Switchyard in left bank with 2 number of feeders.

Godhaneswar Project (Sindol-3) :

§          A Barrage of length 1017.5M with design flood discharge 45100 Cumecs.

§          No mariginal embankement mentioned.

§          Intake cum Power House accommodating 4 x 30 MW Units.

§          220 KV Switchyard on left  bank with 2 numbers of feeder.