
| Welcome | |
| Project Features | |
| Important Events | |
| Commissioning dates |
|
| Salient Features | |
| Generation | |
| Staff strength | |
| Unit Availablity | |
| Reach at Us |


| Category | ||
| Exicutive | ||
| Sanctioned Strength (S.S) | Man in Possion (MIP) on 1/08/2003 | |
| Tech | 56 | |
| H R | 2 | |
| F | 1 | |
| Administrative Non-Exicutive (ANE) | ||
|
Sanctioned Strength
(S.S)
|
Reserve Strength
(R .S)
|
Man in Possion
(MIP) on 1/08/2003
|
|
96
|
100
|
|
| Technical Non-Exicutive (ANE) | ||
|
Sanctioned Strength
(S.S)
|
Reserve Strength
(R .S)
|
Man in Possion
(MIP) on 1/08/2003
|
|
372
|
242
|
|