
| Welcome | |
| Project Features | |
| Important Events | |
| Commissioning dates |
|
| Salient Features | |
| Generation | |
| Staff strength | |
| Unit Availablity | |
| Reach at Us |


The Upper
Indravati Project would form the first step in development of the power potential
of the Indravati
river in Orissa. The project has features favourable for a very economical
hydro electric development such as good water availability, low dams to form
a large regulating storage, less submergence and short water conductor system
to concentrate a high head for power generation. Additional attractive features
of the development is the possibilities of utilising the tail race releases
for providing irrigation to a large command area in the backward district
of the state.
The main works involved in the Upper Indravati project are:
The items of work from point (7) to point (9) are being taken up under the irrigation project . The dam and appurtenant works are taken up as common work for irrigation and power.