ACHIEVEMENTS IN 2007-08

  • OHPC achieved an all time record power generation of 8025 MU and sale of 7909 MU which represents 43% of the total consumption of the State.

  • OHPC earned a record net profit  of Rs.121.39 Crores after meeting its liabilities and income tax.

  • The Ministry of Coal, Govt. of India allotted Baitarni West Coal Block (602 MT) to OHPC, GPCL & KSEB vide letter dtd.25.07.2007. A new company namely Baitarni West Coal Company Ltd. was incorporated on 22/04/2008.

ACHIEVEMENTS IN 2006-07

  • OHPC achieved a record generation of power of 7541 MU. UIHEP achieved record generation of power of 3019 MU.

  • Cash profit achieved during the year was Rs.171.16 Crores.

  • A joint venture company namely Orissa Thermal Power Corporation Ltd.(OTPCL) was incorporated on 29.01.2007. OHPC and OMC hold 50% share capital of the JV company.

ACHIEVEMENTS IN 2005-06

  • RM&U of Unit 3 & 4 of Burla after renovation and modernisation started commercial operation on 01.01.2006 with capacity addition of 16 MW.

  • The rotor pole repair work of all the four units of UIHEP were completed before the schedule.

  • The high interest bearing APDP loan of Rs. 19 Crores plus interest accured has been fully paid to the state govt. in January 2006.

ACHIEVEMENTS IN 2004-05

  • Record Power Generation of 6868 MU is highest in the history of OHPC.

  • Power Generation in Balimela H.E.Project(1526MU) is the 2nd highest since its inception.

  • Energy sold (6726 MU), Turnover(Rs 274.94 cr.) and profit before depreciation (Rs. 169.90 cr.)

  • The Corporation has earned a profit( before tax) of Rs. 64.08 crores.

  • Realisation from GRIDCO (exceeding Rs. 280 crores) is the highest since inception of OHPC.

ACHIEVEMENTS IN 2003-04

  • Capacity addition of 600 MW by commissioning 4 x 150 MW Upper Indravati Project.

  • Capacity addition of 24 MW during 1998 by Renovation Modernization and up-rating of Unit I & II of Burla Power House.

  • Establishment of VSAT communication link from Corporate office to Upper Indravati, Rengali and Balimela Project sites.

  • OHPC has been able to mobilize internal resources from its operation to the extent of Rs 280 Crores for the completed and on going projects and towards other capital expenditures.

  • Out of the term loan of Rs 495.37 Crores availed for the projects, it has repaid Rs 263.15 Crores to the lender PFC.