ACHIEVEMENTS IN 2007-08 |
- OHPC achieved an all time record power generation of 8025 MU and sale of 7909 MU which represents 43% of the total consumption of the State.
- OHPC earned a record net profit of Rs.121.39 Crores after meeting its liabilities and income tax.
- The Ministry of Coal, Govt. of India allotted Baitarni West Coal Block (602 MT) to OHPC, GPCL & KSEB vide letter dtd.25.07.2007. A new company namely Baitarni West Coal Company Ltd. was incorporated on 22/04/2008.
|
ACHIEVEMENTS IN 2006-07 |
- OHPC achieved a record generation of power of 7541 MU. UIHEP achieved record generation of power of 3019 MU.
- Cash profit achieved during the year was Rs.171.16 Crores.
- A joint venture company namely Orissa Thermal Power Corporation Ltd.(OTPCL) was incorporated on 29.01.2007. OHPC and OMC hold 50% share capital of the JV company.
|
ACHIEVEMENTS IN 2005-06 |
- RM&U of Unit 3 & 4 of Burla after renovation and modernisation started commercial operation on 01.01.2006 with capacity addition of 16 MW.
- The rotor pole repair work of all the four units of UIHEP were completed before the schedule.
- The high interest bearing APDP loan of Rs. 19 Crores plus interest accured has been fully paid to the state govt. in January 2006.
|
ACHIEVEMENTS IN 2004-05 |
- Record Power Generation of 6868 MU is highest in the history of OHPC.
- Power Generation in Balimela H.E.Project(1526MU) is the 2nd highest since its inception.
- Energy sold (6726 MU), Turnover(Rs 274.94 cr.) and profit before depreciation (Rs. 169.90 cr.)
- The Corporation has earned a profit( before tax) of Rs. 64.08 crores.
- Realisation from GRIDCO (exceeding Rs. 280 crores) is the highest since inception of OHPC.
|
ACHIEVEMENTS IN 2003-04 |
- Capacity addition of 600 MW by commissioning 4 x 150 MW Upper Indravati Project.
- Capacity addition of 24 MW during 1998 by Renovation Modernization and up-rating of Unit I & II of Burla Power House.
- Establishment of VSAT communication link from Corporate office to Upper Indravati, Rengali and Balimela Project sites.
- OHPC has been able to mobilize internal resources from its operation to the extent of Rs 280 Crores for the completed and on going projects and towards other capital expenditures.
- Out of the term loan of Rs 495.37 Crores availed for the projects, it has repaid Rs 263.15 Crores to the lender PFC.
|