Name of the Power Station |
- |
Chiplima Power
House
|
||
|
2. |
Name of the River |
- |
Mahanadi |
|
|
|
3. |
Location |
|
|
|
|
|
|
(I) State |
- |
Orissa |
|
|
|
|
(ii) Nearest town |
- |
Sambalpur |
|
|
|
|
(iii) Distance |
- |
30 Kms. from Sambalpur |
||
|
4. |
Total Installed Capacity
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(a) No. of existing Units |
- |
3 |
|
|
|
|
(b) Capacity of each Unit |
- |
24 MW |
|
|
|
|
(c )Total capacity |
- |
72 MW |
|
|
|
|
|
|
|
|
|
|
5. |
Reservoir / Pondage |
|
|
|
|
|
|
a) Name of the Dam / Pondate |
- |
Chiplima Power House Forebay |
||
|
|
|
|
|
|
|
|
6. |
Water Turbine |
|
|
|
|
|
|
a) No. of turbines |
- |
3 (Three) |
|
|
|
|
b) Type of turbines |
- |
Kaplan (# 1& 2 - Voith
(Germany)) |
||
|
|
|
|
(# 3 - Russian) |
||
|
|
c) Rated Head |
- |
74.5 Ft. (22.71 mt.) |
|
|
|
|
d) Design head |
- |
72 Ft. |
|
|
|
|
e) Normal Speed |
- |
150 rpm |
|
|
|
|
f) Run-away speed |
- |
368 rpm |
|
|
|
|
|
|
|
|
|
|
7. |
Tail race |
|
|
|
|
|
|
Type of Tunnel / Channel |
- |
Open channel |
|
|
|
|
|
|
|
|
|
|
8. |
Generators |
|
|
|
|
|
|
I) No. of Units |
- |
3 (Three) |
|
|
|
|
ii) Type |
- |
Semi Umbrella Vertical |
||
|
|
iii) Make |
- |
# 1 & 2 - Hitachi |
|
|
|
|
|
|
# 3 - Rusian |
|
|
|
|
iv) Voltage |
- |
11 KV |
|
|
|
|
v) Current |
- |
1420 amp |
|
|
|
|
vi) Power Factor |
- |
0.91 |
|
|