Hirakud - B

The project will comprise the following works.  

Construction of  a new power house at the right dyke of Hirakud dam. This power station would have an installation of 4 Kaplan generating units, each of 48


Future Implementation

MW at the rated head of 130 m The power station would be operated under a head
range from 22.33m to 34.26m.

Construction of a 9/6 Km long power channel conveying the tail waters from Hirakud-B power station to the forebay at Chiplima. This power channel would be capable of carrying a maximum design discharge of 708 cumecs (25,000 cumecs).

The annual energy and peaking capacity benefits from the Chiplima-B and Hirakud-B power station would be as under:

Sl.No

 

Chiplima-B

Hirakud - B

1.

Installed Capacity (MW)

4 x 50 MW

4 x 48 MW

2.

Peaking Capacity benefits (MW)

200 MW

192 MW

3.

Annual 90% dependable Energy (GWh)

122.96 (Pre-Hirakud-B Stage)

267.93 GWh (Post Hirakud-B Stage)

194.41 GWh

4.

Annual Average

Energy (GWh)

167.79 G GWh (Pre-Hirakud-B Stage)

374.27 GWh (Post-Hirakud - B Stage)

301.46 GWh

 

5. (a)

Land Requirement (Total 2004.46 Hac.

1621.23 Ha

383.23 Ha.

    (b)

Rehabilitation Total No. of

Villages = 16, No. of families:572

 

6.

Cost of generation (as per DPR)

(i)       Pre-Hirakud-B Rs.1.58

(ii)Post Hirakud-B Rs.1.49

Rs.1.59

7.

Cost of generation (per KWh.)

(i)       Pre-Hirakud-B, Rs.5.31

(ii)Post Hirakud-B,Rs.3.63

Rs.4.57

  Cost Estimates :- The estimated cost of these projects is given in the table below:

Sl.No.

 

Chiplima-B

Hirakud-B

1.

Civil Works

Rs.411.90 Crs.

Rs.495.58 Crs.

2.

Electrical Works

Rs.313.53 Crs.

Rs.270.05 Crs.

Total

Rs.725.43 Crs.

Rs.765.63 Crs.

3.

IDC

Rs.196.18 Crs.

Rs.189.16 Crs.

Grand Total

Rs.921.62 Crs.

Rs.954.79 Crs.