Hirakud - B
The
project will comprise the following works.
Construction of a new power house at the right dyke of Hirakud dam. This power station would have an installation of 4 Kaplan generating units, each of 48
|
Future Implementation |
MW
at the rated head of 130 m The power station would be operated under a head
range from 22.33m to 34.26m.
Construction of a 9/6 Km long power channel conveying the tail waters from Hirakud-B power station to the forebay at Chiplima. This power channel would be capable of carrying a maximum design discharge of 708 cumecs (25,000 cumecs).
The annual energy and peaking capacity benefits from the Chiplima-B and Hirakud-B power station would be as under:
|
Sl.No |
|
Chiplima-B |
Hirakud - B |
|
1. |
Installed Capacity (MW) |
4 x 50 MW |
4 x 48 MW |
|
2. |
Peaking Capacity benefits (MW) |
200 MW |
192 MW |
|
3. |
Annual 90% dependable Energy (GWh) |
122.96 (Pre-Hirakud-B Stage) 267.93 GWh (Post Hirakud-B Stage) |
194.41 GWh |
|
4. |
Annual Average Energy (GWh) |
167.79 G GWh (Pre-Hirakud-B Stage) 374.27 GWh (Post-Hirakud - B Stage) |
301.46 GWh
|
|
5. (a) |
Land Requirement (Total 2004.46 Hac. |
1621.23 Ha |
383.23 Ha. |
|
(b) |
Rehabilitation Total No. of |
Villages = 16, No. of families:572 |
|
|
6. |
Cost of generation (as per DPR) |
(i)
Pre-Hirakud-B Rs.1.58 (ii)Post Hirakud-B Rs.1.49 |
Rs.1.59 |
|
7. |
Cost of generation (per KWh.) |
(i)
Pre-Hirakud-B, Rs.5.31 (ii)Post Hirakud-B,Rs.3.63 |
Rs.4.57 |
|
Sl.No. |
|
Chiplima-B |
Hirakud-B |
|
1. |
Civil Works |
Rs.411.90 Crs. |
Rs.495.58 Crs. |
|
2. |
Electrical Works |
Rs.313.53 Crs. |
Rs.270.05 Crs. |
|
Total |
Rs.725.43 Crs. |
Rs.765.63 Crs. |
|
|
3. |
IDC |
Rs.196.18 Crs. |
Rs.189.16 Crs. |
|
Grand Total |
Rs.921.62 Crs. |
Rs.954.79 Crs. |
|