At a Glance
Annual Report
Achievements
Financial Details
Monthly Generation
Generation &Sale
Recruitment
Power Scenario
Reservoir Level
R, M & U
Training & Development
power link

 

At a Glance

1.

Incorporated under companies Act.

21.4.95

2.

Year of starting of commercial operation.

1996-97

3.

Date of transfer of HydroPower Assets.

1.4.96

 

(excluding Machhkund)

 

4.

Transfer of Orissa share of Machhkund. ( 34.5 MW )

1.4.97

5.

Installed capacity at the time of transfer of assets.

1272  MW

6.

Present installed capacity.( October , 2006 )

1912 MW

7.

AverageAnnual Generation Capability.

6000 MU

8.

Peak capability.

1100 MW

9.

Installed capacity of ongoing projects:

 

 

  • Potteru Hydro Electric Project.
  • Balimela Extension Project.

6 MW
150 MW


Summary of Performance of OHPC is indicated below:

Design Energy for sale (MU)

Old units
=
3676.86
UIHEP
=
1942.38
Total
=
5619.24

Year
Energy Sold (MU)
Tariff (paise/kwh)
Turnover
Profit/Loss before deprn.
Net Profit/Loss after tax
Cumulative Profit / Loss
 
Old PS
UIHEP
Total
Old PS
UIHEP
(Rs. crores)
1996-97
3585
0
3585
38.00
-
137.79
114.26
69.86
69.86
1997-98
3210
0
3210
49.00
-
173.73
122.05
77.78
147.64
1998-99
3280
0
3280
48.11
-
160.05
99.93
55.21
202.85
1999-00
3892
486
4378
49.64
59.45
219.75
100.19
50.38
253.23
2000-01
2705
1736
4441
50.02
58.63
233.76
65.92
-27.44
225.79
2001-02
3387
2920
6307
24.99
65.40
215.25
92.70
-3.89
221.90
2002-03
2236
790
3026
24.73
63.82
171.41
59.11
-41.92
179.98
2003-04
3686
2110
5796
27.35
64.96(PE)
230.34
118.50
5.70
185.68
2004-05
3899
2827
6726
28.67
62.86(PE)
46.38(SE)
274.94
169.90
59.05
244.73
2005-06
3177
1751
4928
33.69

65.50(PE)
46.38(SE)

208.46
89.70
(-) 24.17
220.56
PS = Power Station
PE = Primary Energy.
SE = Secondary Energy.

As on
Paid up equity capital
Loan ( Rs. crores)
PFC
State Govt.
Total Loan
31.03.2004
320.80
274.26
1801.60
2075.86
31.03.2005
320.80
252.09
1801.60
2053.69
31.03.2006
320.80
228.62
1782.60
2011.22