Chiplima - B

The project will comprise the following works.

  1. four Kaplan Units of 50 MW each with centre spacing of 21.41 m and a service bay length of 27 m. The power house would have a width of 19.75 m and length of 85.64 m The generators would be coupled to varyhing from 18.53 m to 22.68 m.

  2. A 1135 m long tail race channel (excluding Chiplima pond) leading water to Mahanadi River.

  3. The power generated is proposed to be stepped up to 220 KV and evacuated by a double circuit 220 KV and a single circuit 220 KV line (in post Hirakud-B stage).

In addition to the above works, following modifications in the various structures of the existing The Project will comprise the following works :-

  1. A Second head regulator at Pond-1 designed for a maximum discharge capacity of 354 cumecs, having five bays of 10 m width and gates of size 10 m x 4 m.

  2. A parallel power channel 6.650 Km long (excluding the ponds) adjacent to existing power channel designed for a maximum discharge of 354 m3/sec. The power channel will havea bed width of 48 m and is provided with concrete lining.

  3. A new forebay comprising of :

    d . A forebay dam with max. height of 27.5 m affording a live capacity of 7.00 Mcum.

    e. A concreter spillway designed for a maximum discharge of 1417 cumecs. This is to cater for the simultaneous tripping of all machines at Chiplima-A and Chiplima-B. The height of automatic gate is 2.2 m. The concrete spillway comprises of 15 bays of 15 m each.

    A power house at Chiplima-B integrated with forebay dam. The Power House would accommodate Chiplima -A power station to maintain the same forebay level at both Chiplima-A and Chiplima-B power houses for integrated operation have been planned.

    1) Strengthening/raising of right bank of existing power channel from new forebay to Chiplima-A power house.

    2) Strengthening/raising of intake structure, sluice portion and providing a plug wall in leading cut channel of Chiplima-A power station.