As on 1.04.2005
| Category | ||
| Exicutive | ||
| Administrative Non-Exicutive (ANE) | ||
|
Sanction Strength
(S.S)
|
Reserve Strength
(R .S)
|
Man in Position
(MIP)
|
|
144
|
99
|
99
|
| Technical Non-Exicutive (TNE) | ||
|
Sanction Strength
(S.S)
|
Reserve Strength
(R .S)
|
Man in Position
(MIP)
|
|
699
|
390
|
352
|